Contents

EXECUTIVE SUMMARY

1            INTRODUCTION

2            SUMMARY OF EM&A REQUIREMENTS AND MONITORING RESULTS

3            LANDSCAPE AND VISUAL

4            LAND CONTAMINATION

5            SITE INSPECTION AND AUDIT

6            NON-COMPLIANCE, COMPLAINTS, NOTIFICATIONS OF SUMMONS AND SUCCESSFUL PROSECUTIONS

7            IMPLEMENTATION STATUS OF ENVIRONMENTAL MITIGATION MEASURE

8            CONCLUSION AND RECOMMENDATION

 

Tables

Table 1                 Contact Information of Key Personnel

Table 2                 Main Construction Works carried out in the Reporting Period

Table 3                 Air Quality and Noise Monitoring Locations

Table 4                 Coordinates of Water Quality Monitoring Locations

Table 5                 Summary of Water Quality Exceedance

Table 6                 Observations and Recommendations of Site Audit

Table 7                 Waste Generated by the Construction and Disposal Ground

Table 8                 Status of submissions required under the EP

 

Figures

Figure 1               Location of Proposed Yuen Long Effluent Polishing Plant

Figure 2               Location of Construction Dust Monitoring Stations.

Figure 3               Noise Monitoring Locations.

Figure 4               Water Quality Monitoring Locations.

Figure 5               Ecology Monitoring Locations.

Figure 6               Active Night Roost Monitoring Area and Vantage Points; And Noise Monitoring Stations. 6

 

Appendix

Appendix A     Construction Programme

Appendix B     Project Organization Chart

Appendix C     Action and Limit Levels

Appendix D     Graphical Presentation of Monitoring Data

Appendix E     EVENT AND ACTION PLANS

Appendix F     WASTE FLOW TABLE

Appendix G     Implementation Status of Environmental Mitigation Measures

Appendix H     Cumulative statistics on Environmental Complaints, Notifications of Summons and Successful Prosecutions